(c) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Result:
C -- CHECK FOR OPEN IN CAN NO. 2 BUS MAIN WIRE (CAN NO. 5 J/C)
B -- REPAIR OR REPLACE CAN BUS MAIN WIRE OR CONNECTOR (CAN NO. 3 J/C - CAN NO. 4 J/C)
A -- REPLACE CAN NO. 4 JUNCTION CONNECTOR
5. CHECK FOR OPEN IN CAN NO. 2 BUS MAIN WIRE (CAN NO. 5 J/C)
(a) Reconnect the CAN No. 4 junction connector.
(b) Disconnect the CAN No. 5 junction connector.
Text in Illustration
(c) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
NG -- REPAIR OR REPLACE CAN BUS MAIN WIRE OR CONNECTOR (CAN NO. 4 J/C - CAN NO. 5 J/C)
OK -- REPLACE CAN NO. 5 JUNCTION CONNECTOR
6. CHECK FOR SHORT IN CAN NO. 2 BUS WIRE (POWER MANAGEMENT CONTROL ECU)
(a) Disconnect the power management control ECU connector.
No comments:
Post a Comment