INSPECTION PROCEDURE
NOTICE:
When replacing the brake actuator assembly, perform zero point calibration and store system information See: Brakes and
Traction Control/Antilock Brakes / Traction Control Systems/Testing and Inspection/Programming and Relearning.
PROCEDURE
1. PERFORM ACTIVE TEST USING TECHSTREAM (ABS MOTOR RELAY)
(a) Connect the Techstream to the DLC3.
(b) Start the engine.
(c) Select the Active Test on the Techstream See: Brakes and Traction Control/Antilock Brakes / Traction Control Systems/Testing and
Inspection/Scan Tool Testing and Procedures/Data List / Active Test.
ABS/VSC/TRAC
(d) Check for operating sound of the ABS motor relay when operating it using the Techstream.
Result:
B -- RECONFIRM DTC
A -- Continue to next step.
2. INSPECT SKID CONTROL ECU (GND2 TERMINAL)
(a) Turn the engine switch off.
(b) Make sure that there is no looseness at the locking part and the connecting part of the connectors.
(c) Disconnect the skid control ECU connector.
No comments:
Post a Comment