Text in Illustration
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
NG -- CHECK FOR OPEN IN CAN NO. 2 BUS MAIN WIRE (CAN NO. 3 J/C)
OK -- REPLACE POWER MANAGEMENT CONTROL ECU
3. CHECK FOR OPEN IN CAN NO. 2 BUS MAIN WIRE (CAN NO. 3 J/C)
(a) Reconnect the power management control ECU connector.
(b) Disconnect the CAN No. 3 junction connector.
Text in Illustration
(c) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Result:
C -- CHECK FOR OPEN IN CAN NO. 2 BUS MAIN WIRE (CAN NO. 4 J/C)
B -- REPAIR OR REPLACE CAN BUS MAIN WIRE OR CONNECTOR (CAN NO. 3 J/C - POWER MANAGEMENT
CONTROL ECU)
A -- REPLACE CAN NO. 3 JUNCTION CONNECTOR
No comments:
Post a Comment