(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Text in Illustration
NG -- REPLACE ECU IG1 FUSE
OK -- Continue to next step.
2. CHECK BATTERY
(a) Install the ECU IG1 fuse.
(b) Check the battery voltage.
Standard Voltage:
11 to 14 V
NG -- CHECK OR REPLACE CHARGING SYSTEM OR BATTERY (for 2GR-FSE) See: Starting and Charging/Charging
System/Testing and Inspection/Component Tests and General Diagnostics
OK -- Continue to next step.
3. INSPECT SKID CONTROL ECU (IG1 TERMINAL)
(a) Make sure that there is no looseness at the locking part and the connecting part of the connectors.
(b) Disconnect the skid control ECU connector.
(c) Turn the engine switch on (IG).
(d) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
HINT
If troubleshooting has been carried out according to Problem Symptoms Table, refer back to the table and proceed to the next
step See: Brakes and Traction Control/Antilock Brakes / Traction Control Systems/Testing and Inspection/Symptom Related
No comments:
Post a Comment