Text in Illustration
NG -- REPLACE FUSIBLE LINK BLOCK (ABS NO.2 FUSE)
OK -- Continue to next step.
2. INSPECT SKID CONTROL ECU (+BS TERMINAL)
(a) Install the fusible link block to the engine room relay block.
(b) Make sure that there is no looseness at the locking part and the connecting part of the connectors.
(c) Disconnect the skid control ECU connector.
(d) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Text in Illustration
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR (+BS CIRCUIT)
OK -- Continue to next step.
3. INSPECT SKID CONTROL ECU (GND1 TERMINAL)
(a) Measure the resistance according to the value(s) in the table below.
No comments:
Post a Comment