(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
NG -- REPLACE IG2 RELAY
OK -- Continue to next step.
5. INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY (IG NO. 1, IG NO. 2 AND IG NO. 3 RELAY)
(a) Remove the instrument panel junction block assembly See: Body and Frame/Body Control Systems/Body Control Module/Service
and Repair/Removal.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Text in Illustration
NG -- REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
OK -- Continue to next step.
6. CHECK HARNESS AND CONNECTOR
(a) Measure the resistance according to the value(s) in the table below.
No comments:
Post a Comment