10. CHECK HARNESS AND CONNECTOR (ENGINE ROOM RELAY BLOCK ASSEMBLY - BODY GROUND)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Text in Illustration
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR (ENGINE ROOM RELAY BLOCK ASSEMBLY - BODY
GROUND)
OK -- Continue to next step.
11. CHECK POWER MANAGEMENT CONTROL ECU
(a) Install the instrument panel junction block assembly See: Body and Frame/Body Control Systems/Body Control Module/Service and
Repair/Installation.
(b) Reconnect the F7 and F8 connectors.
(c) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Text in Illustration
NG -- REPLACE POWER MANAGEMENT CONTROL ECU See: Power and Ground Distribution/Power Distribution
Module/Service and Repair/Removal
OK -- USE SIMULATION METHOD TO CHECK See: Accessories and Optional Equipment/Antitheft and Alarm
Systems/Diagrams/Diagnostic Aids/How To Troubleshoot ECU Controlled Systems/How To Proceed With Troubleshooting
No comments:
Post a Comment