NG -- REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
OK -- Continue to next step.
2. CHECK HARNESS OR CONNECTOR
(a) Disconnect the T2 connector.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Text in Illustration
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.
3. CHECK HARNESS AND CONNECTOR
(a) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
(b) Measure the resistance according to the value(s) in the table below.
No comments:
Post a Comment