Showing posts with label (3) Measure the voltage according to the value(s) in the table below.. Show all posts
Showing posts with label (3) Measure the voltage according to the value(s) in the table below.. Show all posts

Thursday, June 27, 2019

2010 Lexus Truck RX 350 AWD V6-3.5L (2GR-FE) Page 515


(3) Measure the voltage according to the value(s) in the table below.



Standard Voltage:



(f) Check the open in the circuit.



(1) Turn the engine switch off.



(2) Disconnect the cable from the negative (-) battery terminal.



NOTICE:



Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system.



(3) Measure the resistance according to the value(s) in the table below.



Standard Resistance:



(g) Check the short to ground in the circuit.



(1) Measure the resistance according to the value(s) in the table below.



Standard Resistance:



(h) Check the short in the circuit.



(1) Release the activation prevention mechanism built into connector B See: Restraints and Safety Systems/Air Bag Systems/Testing



and Inspection/Initial Inspection and Diagnostic Overview/Diagnosis System.



(2) Measure the resistance according to the value(s) in the table below.



Standard Resistance:



Text in Illustration



NG -- REPLACE FLOOR WIRE



OK -- Continue to next step.



4. CHECK CENTER AIRBAG SENSOR ASSEMBLY



(a) Restore the released activation prevention mechanism of connector B to the original condition.

Thursday, March 14, 2019

2010 Lexus Truck RX 350 AWD V6-3.5L (2GR-FE) Page 524


(3) Measure the voltage according to the value(s) in the table below.



Standard Voltage:



(f) Check the open in the circuit.



(1) Turn the engine switch off.



(2) Disconnect the cable from the negative (-) battery terminal.



NOTICE:



Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system.



(3) Measure the resistance according to the value(s) in the table below.



Standard Resistance:



(g) Check the short to ground in the circuit.



(1) Measure the resistance according to the value(s) in the table below.



Standard Resistance:



(h) Check the short in the circuit.



(1) Release the activation prevention mechanism built into connector B See: Restraints and Safety Systems/Air Bag Systems/Testing



and Inspection/Initial Inspection and Diagnostic Overview/Diagnosis System.



(2) Measure the resistance according to the value(s) in the table below.



Standard Resistance:



Text in Illustration



NG -- REPLACE NO. 2 FLOOR WIRE



OK -- Continue to next step.



4. CHECK CENTER AIRBAG SENSOR ASSEMBLY



(a) Restore the released activation prevention mechanism of connector B to the original condition.

Wednesday, January 30, 2019

2010 Lexus Truck RX 350 AWD V6-3.5L (2GR-FE) Page 667


(3) Measure the voltage according to the value(s) in the table below.



Standard Voltage:



(f) Check for an open in the circuit.



(1) Turn the engine switch off.



(2) Disconnect the cable from the negative (-) battery terminal.



NOTICE:



Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to disable the SRS system.



(3) Measure the resistance according to the value(s) in the table below.



Standard Resistance:



(g) Check for a short to ground in the circuit.



(1) Measure the resistance according to the value(s) in the table below.



Standard Resistance:



(h) Check for a short in the circuit.



(1) Release the activation prevention mechanism built into connector B See: Restraints and Safety Systems/Air Bag Systems/Testing



and Inspection/Initial Inspection and Diagnostic Overview/Diagnosis System.



(2) Measure the resistance according to the value(s) in the table below.



Standard Resistance:



Text in Illustration



NG -- REPLACE NO. 2 FLOOR WIRE



OK -- Continue to next step.



2. CHECK CENTER AIRBAG SENSOR ASSEMBLY



(a) Restore the released activation prevention mechanism of connector B to the original condition.